FAQ Topic: Inspections

Reinspection

If the work to be inspected is not completed or ready at the requested date or by the arrival of the inspector or the building does not comply with the code and another inspection is required, then a reinspection fee of $200.00 may be assessed. This must be paid prior to the reinspection or any … Continued

Final Inspection

Made after all exterior and interior work is completed, including electric and HVAC, and building is ready for use and occupancy.

Other Inspections

In addition to the called inspections above, the Building Official may make or require any other inspections or special inspections to ascertain compliance with Codes and other requirements enforced by the Building Official.

Final Electrical/Mechanical

Made after fixtures and devices are in place, HVAC installation is completed, and everything is operational.

Drywall

Made after all drywall is hung, but before it is taped or finished.

Insulation/Vapor Barrier

Made after insulation and vapor barrier are installed. If you are installing blown-in insulation in the attic, it will be inspected with structural final inspection.

Rough Framing/Masonary

Made after roof, masonry, all framing, fire stopping, draft-stopping, and bracing are in place, and previous inspections are completed.

Rough Electrical/Mechanical

Made prior to covering or concealment, all boxes and wiring completed, grounding in boxes completed, ductwork completed and prior to or along with framing inspection.

Foundations/Slab

Made after excavation, forms, gravel, required mesh, rebar, plumbing, and vapor barrier are in place. Perimeter drains, damp-proofing or waterproofing shall be completed and inspected prior to backfilling.

Footer

Made after excavation is completed and crumbed out, forms are set, or footer is staked, and any rebar required is placed. Lot line markers will also be checked.